Scheduling, design and installation services
Time Scheduling
We have the ability to coordinate all aspects of your laboratory construction from preconstruction drawings, through final approved drawings, to material delivery coordination with your other building trades to meet everyone's scheduling objectives.
Design/Approval Drawings
During the scheduling phase we generate computer generated (CAD) drawings that reflect the materials included for your project. These drawings follow through from start to finish reflecting all stages of your laboratory construction. Upon completion these drawings will reflect your completed installation and can be used for future reference when planning expansions.
Installation
Using our own installation department guarantees you a quality-finished project using quality products from one single responsible source. Before installation is 100% complete we conduct our own inspection punch list and correct any items of concern to ensure that all areas are in good acceptable condition.
